Residential Permit Fee Schedule

Single Wide Mobile Homes Permit  $350.00
New Residential Construction, Including
Doublewide mobile homes, modular homes, Additions, covered porches, garages, carports, Storage buildings.
 
Type A (Includes Zoning Compliance Permit) $ .35 per sq. ft.
Type B (Building Permit Only) $ .35 per sq. ft.
Residential Remodeling or Renovation $ .25 per sq. ft.
Swimming Pools  
Above Ground Pool $50.00
In Ground Pool $50.00
House Moving Permit  $175.00

 

 

 

 

 

 

 

 

 

 

Documents and Records Fee $5.00

Commercial and Industrial Permit Fee Schedule


Total Valuation
$1,000 and less
No fee, unless inspection required, in which case a
$30.00 fee for each inspection shall be charged.
$1,001 – $15,000 $30.00 for the first $2,000 plus $8.00 for each
additional thousand or fraction thereof, to and
including $15,000.
$15,000 – $50,000 $134.00 for the first $15,000 plus $7.00 for each additional thousand or fraction thereof, to and including $50,000.
$50,000 – $100,000 $379.00 for the first $50,000 plus $6.00 for each additional thousand or fraction thereof, to and
including $100,000.
$100,000 – $500,000 $655.00 for the first $100,000 plus $4.50 for each additional thousand or fraction thereof, to and
including $500,000.
$500,000 – and up $2,455.00 for the first $500,000 plus $3.50 for each additional thousand or fraction thereof.
Signs Permits $55.00 for the first $1,000.00 plus $3.00 for each additional thousand or fraction thereof.
Plumbing Permits $ 75.00 for new and existing construction.
Mechanical Permits $ 75.00 for new and replacement construction.

Documents and Records Fee $5.00

Permit fees apply to all new construction and the replacement of any existing construction. Building permits are good for two (2) years, but if construction is not
commenced within six (6) months the permit shall expire. Permits may be renewed for a period not to exceed one year provided the renewal is applied for prior to the permit
expiring.

Permits for swimming pools are good for six (6) months and can only be renewed for three (3) months providing the pool is not capable of holding water.

Construction Prior to Obtaining a Permit: When construction is commenced prior to a Zoning Compliance Permit being obtained the permit fee shall be double the amount set out in this section.

This fee schedule is established by the Robertson County Commission and is subject to change at any time.

Other Fees


Residential Subdivision Plat Review Fees

Minor Plats (1-5 Lots) $ 70.00 plus$ 7.00 per lot
Preliminary Plats $140.00 plus $14.00 per lot.
Construction Plans $140.00 plus $14.00 per acre
Final Plats $ 70.00 plus $7.00 per lot.

** Reviews requiring outside engineering review billed on actual cost from vendor

Commercial/Industrial Subdivision Plat Review Fees

Preliminary Plats $210.00 plus $20.00 per lot.
Construction Plans $210.00 plus $20.00 per acre.
Final Plats $70.00 plus $7.00 per lot.

** Reviews requiring outside engineering review billed on actual cost from vendor

** All outside engineering fees shall be paid prior to the secretary of the Planning Commission signing the final plat. 

Site Plans (Residential, Commercial and Industrial)

Agricultural and Single Family Residential Uses $ 70.00 plus $ 7.00 per acre.
Multi-family Residential and Commercial Uses $140.00 plus $14.00 per acre.
Light, General and Heavy Industrial Uses $210.00 plus $20.00 per acre.
Special Impact Uses  
Preliminary Site Plans $3,500.00 plus $14.00 per acre.
Final Site Plans $3,500.00 plus $15.00 per acre.
Planned Unit Developments $425.00 plus $7.00 per acre.

Rezoning Request

Changes to AG-1, AG-2. R-40 and R-30
Five (5) acres or less
Greater than five (5) acres
$175.00 plus $12.00 per acre
$460.00 plus $12.00 per acre
Changes to R-20, C-1, C-2, C-3 and C-4
Three (3) acres or less
Greater than three (3) acres
$230.00 plus $12.00 per acre
$460.00 plus $12.00 per acre
Changes to I-1 and I-2
Three (3) acres or less
Greater than three (3) acres
$350.00 plus $12.00 per acre
$575.00 plus $12.00 per acre
Changes to I-3
All tract sizes
$3,000.00 plus $10.00 per acre

Changes for Planned Unit Developments All tract sizes

Rezoning in Springfield Planning Region

** Reviews requiring outside engineering review billed on actual cost from vendor

** All outside engineering fees shall be paid prior to any building permit being used

$575.00 plus $10.00 per acre 

$100.00

 

 

Board of Zoning Appeals $190.00
Construction Board of Appeals $350.00
Adequate Facilities Tax
Residential
Commercial/Industrial
$1.50 per sq. ft.
$ .30 per sq. ft.

Documents and Records fee $5.00